We look at how your operation is actually run

Not how the procedures say it runs. How it runs on a Tuesday afternoon when two people are away and the plan has already slipped.

Five pillars. Forecast, Plan, Schedule, Implement, Review.

The five MOS pillars: Forecast, Plan, Schedule, Implement, Review

Forecast, plan, schedule

Forecasting is knowing what is coming before resources are committed: demand, resources and risk, on evidence rather than a guess. Planning turns that outlook into structure, and scheduling puts it against time and people so coordination is deliberate rather than negotiated every morning.

Plan items committed against time and people, with variance against the plan
Actions tracked with one owner and one audit chain

Implement, then review

Implementation is execution with discipline, with short interval control, so a shift that is drifting is caught during the shift and not after it. Review closes the loop and feeds back into the next forecast. Each pillar builds on the last, and the meeting cycle is timed to match. When meetings do not line up with the work they become calendar filler.

Glencore. Underground, and open cut.

Nine days on site, 111 criteria

We ran over twenty interviews across every level and department, observed more than twenty meetings, reviewed the site standard and the data, and scored the operation against 111 criteria across nine sections. It came out at 65 per cent overall, with meeting effectiveness weakest at 56 per cent. We reported the strengths as well: departments that excelled, meetings that were solid and minuted, standout individuals.

Reviewed against the site standard and the regulation behind it
NEXIS, the system the audit recommended

What the audit led to

The audit closed on opportunities and next steps: e-learning, one page training, automated reporting, and one system to pull the operation together. We built the e-learning and the one page training, and they became the training we sell. The site already ran Coal Action for its actions, and it worked, which is why mos | AR was not what it needed. NEXIS is production ready today, either as the data collector the other tools report into or as the start of a full digital Management Operating System, and is awaiting its first installation. The site itself took BlockBuilder, with Official and PanelPlanner to follow.

Twenty eight days on shift

At a Glencore open cut operation we spent about 28 days embedded across four maintenance crews, from 4.45am handovers through night shift pre-starts. We left behind nine things a supervisor uses on a Monday: a review template, a pre-start coaching protocol, a handover format, shift and swing logs, an action tracker and the week that was pack.

Training built from what the reviews found

Two ways to start

Where a review often leads

Free operational health check

A 30 minute online session. We ask how the work is planned, handed over and followed up, and tell you where we would look first. No charge and no obligation.

MOS review

The full engagement. We come to site, watch the work, talk to your people, and score the operation against the five pillars. You get a compliance position per section and an action plan with owners, timelines and measures of success. Most reviews end in a training recommendation, a software recommendation, or both. We will tell you which, and we will tell you if the answer is neither.

Scored against the five pillars
Futuristic digital interface with technology icons and a holographic hand interaction.

Start with thirty minutes.

The health check is a 30 minute online session, no charge and no obligation. The worst case is you learn where we would look first.

Get in touch → info@mappedoutsolutions.com