Twenty eight days on shift with thirteen supervisors
Client: Glencore, open cut. Engagement: Maintenance department review, phase II. Lead: Terry Henrikson, Senior MOS Coach. About 28 days embedded, November to December 2025.
28
days embedded
13
supervisors
4
maintenance teams
9
things left behind
What we were asked to do
A plan-do-check-act review of supervisor processes, rhythms, routines and behaviours across four maintenance teams: tier 1 and tier 2 field maintenance, coal handling and filtering, and infrastructure. Thirteen supervisors across four crews.
How we did it
Side by side with supervisors. From 4.45am handovers, through night shift pre-starts, and alongside them for the working day.
We also observed the departments around the focus area, because the things that disrupt a maintenance supervisor usually start somewhere else.
This was phase II. Phase I came first, and the relationship was already established before anyone was embedded.
What we found
The most consistent theme was visible leadership. Supervisors and crews needed to see their managers in the field, not for oversight but for the ordinary reinforcement that tells people their work is noticed. Doing the rounds is a small call on a manager’s time and a large one on how a crew feels about the job.
What we left behind
Nine things, built and embedded while we were there rather than written up afterwards:
- A supervisors review template
- A pre-start coaching protocol
- A handover and pre-start documentation format
- A shift log and swing log
- An action tracker
- The Week That Was pack
- Safety initiatives prompted through the health and safety team
- A visible leadership recommendation
- Engagement with the training department
Why it matters
Consultancy that ends in a report ends. This ended in nine things a supervisor uses on a Monday, which is the only test of whether a review was worth running.