Client: Glencore, underground. Engagement: Management Operating System audit. Lead auditor: Loz Hemmings, Director. Nine days on site, July and August 2025.

9

days on site

111

criteria, across nine sections

65%

overall compliance

56%

meetings, the weakest area

What we were asked to do

A comprehensive review of the embedded Management Operating System across every key operational area. Not a document review from a desk. A look at how the operation actually runs.


How we did it

  • Over twenty semi-structured interviews, from operators to managers, across every department.
  • Over twenty meetings observed: daily review, PCGs, 36 week planning, operational readiness, daily lock-ins, pre-shifts, control room, supervisor and area reviews.
  • Document review across the site standard, meeting minutes, site reports, department-specific standards and the current plan of action.
  • Data analysis across the site’s own systems.
  • Then checklist-driven scoring: 111 criteria across nine sections, with narrative observations on meeting dynamics, action follow-through and how departments worked with each other.

What we found

Overall compliance came out at 65 per cent. Meetings were the weakest area at 56 per cent, with department-specific routines the strongest at 71 per cent.

The pattern underneath the score was consistent: actions were being raised faster than they were being closed, the systems meant to track them were not trusted, and the governing document had grown to a size nobody could reasonably use.


What we recommended

  • Replace the action database with one integrated system, with automatic capture, notification and tracking.
  • Cut the site standard from 120 pages to around 20, referencing department-specific documents, supported by one-page training modules.
  • Mandate inter-departmental attendance at key meetings, enforce minutes, and run a site-wide calendar.
  • Standardise automated reporting and remove the reliance on handwritten reports.

What happened next

The site already ran Coal Action for its action tracking, which is why mos | AR was not what it needed. It took BlockBuilder first, with Official and PanelPlanner to follow. mos | NEXIS is production ready and awaiting its first installation, and is not running at this site.

That is the shape of how we work. The review finds the problem, and we are able to build the answer rather than hand over a report and leave.

Futuristic digital interface with technology icons and a holographic hand interaction.

Want this look at your operation?

Start with a 30 minute health check, no charge and no obligation, or read what a full review involves.